Arman Khan requested assistance — JK flip-flop toggling incorrectly at Bench B-08. Clock pulse width appears too narrow.

Observation Logs
10 entries · 4 today
Bench B-04 power supply tripped on OCP at 2.8 A. Output fell to 0 V. Marked for repair; do not use until cleared.
Students are spending more time than expected on JK flip-flop truth tables. Consider extending the practical by 15 minutes next session.
Digital Electronics Lab (EC-204) started on time with 24 students checked in across 18 benches.
Vikram Joshi absent without notice — third miss this month. Flagged for advisor follow-up.
Bench B-09 flagged for maintenance — PSU replacement on order. Bench blocked in the assignment grid.
Fluke 117 (DMM-0117-0048) at Bench B-06 passed its calibration window. Restricted for graded measurements.
Two students in EC-204 without lab coats. Verbal warning issued; remind at start of next session.
Analog Circuits Lab (EC-201) completed successfully. 22 of 22 students evaluated.
Bench B-03 used a jumper wire in place of a broken BNC connector — worked well. Replace the connector during next maintenance cycle.